Hiya,
I am designing a VMware environment. I'm going to have 2 up-links going to 2 pSwitches.
The teaming method being used will be "route based on originating port ID". Is there any reason I cannot set both uplinks to active/active?
cheers Mike
Hiya,
I am designing a VMware environment. I'm going to have 2 up-links going to 2 pSwitches.
The teaming method being used will be "route based on originating port ID". Is there any reason I cannot set both uplinks to active/active?
cheers Mike